Axiall Lotte Lake Charles
Axiall Lotte Lake Charles
87 machines
87 machines
120
120 personnel
10
10 Frontline Supervisors

LOTTE-AXIALL ETHANE CRACKER PROJECT
A 220-acre development in Lake Charles working directly for the owner.
- Excavated and embanked 1.2 Million CY earth materials to line and grade.
- Installed turnkey underground piping systems.
- Manipulated over 10,000 tons of fly-ash for soil conditioning.
- Manipulated over 30,000 tons of lime for soil stabilization.
- Installed over 550,000 tons of aggregate base materials to line and grade.
Peek forces included 87 machines and 120 personnel and 10 Frontline Supervisors.