DOW Seadrift Industrial Spur
Burlington Northern Santa Fe Railroad Port Lavaca, Texas
225k
Man-hours with no lost time injuries
DOW Seadrift Industrial Spur
Burlington Northern Santa Fe Railroad Port Lavaca, Texas
- Build in construction 8.7 miles and separate Wye Track
- Excavate & embank 1.3 million CY of earth material
- Mitigated 22.6 acres of wetlands
- Excavated 50 acres of USDA catfish ponds
- Excavated 5 cattle ponds
- Constructed 800 LF of railroad bridges
- Constructed 3 state highway overpasses
- Constructed multiple county and private crossings
- Installed 11 each E-80 loading crossings
- Constructed 10’ x 10’ x 5-barrel culvert runs
Substantial completion with difficult milestones in 11.5 months – two weeks ahead of schedule within owners budget including value engineering. 225,000 man-hours with no lost time injuries!