Gulf Coast Expansion - Mont Belvieu
- Excavated and embanked 650,000 CY earth material
- UG piping systems including 11,500 LF RCP, 3,000 LF Box Culverts, 1,500 LF Sanitary, 9,728 LF HDPE Fire Water, Stainless-Steel Potable Water 1,200 LF, Electrical Duct 75,750 LF PVC, Instrument Duct 13,000 LF Rigid Steel Pipe
- Soil stabilization including 13,910 tons of lime
- Imported and placed 386,000 TN Crushed Stone
- Site Concrete - 10 Structural Loading Islands
- 2 Structural Concrete Strainer Interceptors
- Structural Concrete Pump Pit
- 2 Structural Concrete Weigh Bridges
- 23 Electrical High-mast Foundations
- 19,235 LF Structural Trench Drain System
- 420,000 SF JRCP Paving System
- 59,000 TN HMAC Paving System