Industrial

Kinder Morgan BOSTCO

Kinder Morgan BOSTCO

No items found.
Date
Location
Location
La Porte, Texas
Client
BOSTCO

Kinder Morgan

BOSTCO

A 200-acre development in La Porte, Texas working directly for the Owner

  • 300,000 cubic yards of onsite excavation and embankment
  • 350,000 cubic yards of imported select fill
  • 22,350 LF of storm water system
  • 32,065 LF of fire water system installation
  • 51,560 tons of crushed stone placement
  • Turnkey railroad system construction including an overpass and railcar storage yard

Case study for the project:

  • In-situ soil mixing at Barns Island (existing DMPA) during dredge operations
  • Built the surrounding levee to capacity
  • Constructed the fire loop and storm water system
  • Dredge operator (Orion Marine) piped dredge material directly into the levee system
  • WT Byler Co in-situ soil mixed with reagents the entire island to designed elevations
  • Piling contractor (Keller) installed vibro-stone columns beneath the ring-wall foundations