Transform Your Next Project with WT Byler Co.

WT Byler Co. has over 50 years of experience in site preparation, turnkey railroad construction, and Class-I Mainline Railroad maintenance. We deliver expert results, on time and within budget. Let us help you complete your next project with precision.

Industrial

Subsea-7

1.5-mile pipeline fabrication spool-base pipe-yard in Port Isabel, Texas

20" Pipelines

gas pipelines of up to 20" diameter

Date
Location
Location
Port Isabel, Texas
Client

Subsea-7

1.5-mile pipeline fabrication spool-base pipe-yard in Port Isabel, Texas

  • Performed 58 acres of site clearing and grubbing
  • Excavated and placed to line and grade 70,000 cubic yards of earth material
  • Installed the site underground utilities
  • Constructed two structural building pads for a welding assembly-line warehouse and storage warehouse
  • Soil stabilized, installed bi-axial geogrids for base reinforcement, imported and placed to line and grade over 70,000 tons of limestone material including an area 715,000 square foot pipe lay-down yard
  • Constructed in place 98 structural concrete foundation sleepers

A world-class solution to serve the increasing deepwater pipeline and steel catenary risers market fabricating and storing oil and gas pipelines of up to 20" diameter

Contact the Experts in Heavy Civil & Turnkey Railroad Construction
Today

Looking for expert site preparation and railroad construction? Partner with W.T. Byler Co. for safe, efficient, and exceptional project delivery. Delivering industry leading solutions since 1973.